Activity Code Indicators
The Indicators tab contains the settings which determine how a process is to work for the selected record.
Indicators have a default setting, which is the setting for all the records in the related screen unless this value is manually updated for a specific record. Default values are set up on
.The indicator settings of multiple records can be updated at the same time by using the Replace feature. For more information, see
.Note
Not all indicator settings are listed below.
Activity Code Indicator ActiveRoster Standard 1
Activity Code Indicator ActiveRoster Standard 1 identifies the activity codes to be included in the ActiveRoster monitoring.
Valid Indicator Options:
N |
This activity code is included in ActiveRoster monitoring and is considered Non-Productive. Employees assigned this activity code appear in the Non-Worked grid. |
P |
This activity code is included in ActiveRoster monitoring and is considered Productive. Employees assigned this activity code appear in the Worked grid. |
W |
This activity code is included in ActiveRoster monitoring and is considered Non-Productive Worked. Employees assigned this activity code appear in the Worked grid. |
Z |
This activity code is not included in ActiveRoster monitoring. Employees assigned this activity code are not displayed in the ActiveRoster grids. |
Note
This indicator is found in
.Activity Code Indicator SS Solution Standard 2
Activity Code Indicator SS Solution Standard 2 is used to determine which activity codes accumulate toward coverage totals. Only activity codes with this value set to Y can be used for creating Request to Work options.
Note
This indicator is found in
.Valid Indicator Options:
N |
Activity does not count toward coverage totals |
Schedules for this activity code are not included in the results list. |
Y |
Activity does count toward coverage totals |
Schedules for this activity code are included in the results list, if the activity code is also authorized by Activity Code Indicator SS Solution Standard 7 or by being included in the Profile Activities. |
Activity Code Indicator SS Solution Standard 3
Activity Code Indicator SS Solution Standard 3 is used to determine whether hours assigned to employees through this activity code should accumulate toward their Scheduled Hours totals. Scheduled hours totals are informational only, and are not validated during the scheduling process. (In contrast, overtime and approved hours totals are validated using the SchedHours rule.)
Valid Indicator Options:
Y |
Yes, hours assigned with this activity code should accumulate towards Scheduled Hours totals. |
N |
No, hours assigned with this activity code should not accumulate toward Scheduled Hours totals. |
This indicator is found on
.Activity Code Indicator SS Solution Standard 6
Activity Code Indicator SS Solution Standard 6 determines whether the user must enter an activity length when entering a zero-length activity code into the schedule grid.
When this value is set to Y, the user receives a prompt to enter the length of the activity. The user can also specify a start time for the activity, so that this information can be tracked by the system.
Valid Options:
N |
When entering this activity code, an hour value is not required. |
Y |
When entering this activity code, an hour value is required. |
Activity Code Indicator Sched Incentive Standard 1
Activity Code Indicator Sched Incentive Standard 1 determines whether a specific activity code can be used when creating a schedule incentive.
Valid Indicator Options:
N |
Activity is not available to employees for schedule incentives. This activity code is not included in the list when creating a schedule incentive record. |
Y |
Activity is available to employees for schedule incentives. This activity code is included in the list when creating a schedule incentive record. |
Note
This indicator is found in
.Activity Code Indicator Schedule Standard 1
Activity Code Indicator Schedule Standard 1 determines whether an activity code is productive or non-productive.
Valid Indicator Options:
N |
This activity code is non-productive. |
P |
This activity code is productive. |
Note
This indicator is found in
.Activity Code Indicator Schedule Standard 2
Activity Code Indicator Schedule Standard 2 determines which shift an activity code should count toward, if any. Each activity code can either count toward the Day shift, the Evening shift, the Night shift, or none of the shifts.
This information is used with the Shift Equity rule, which regulates the number of activities that should be scheduled for each shift within a pay period.
Valid Indicator Options:
D |
The activity code is applied to the employee Day shifts. |
E |
The activity code is applied to the employee Evening shifts. |
N |
The activity code is applied to the employee Night shifts. |
O |
The activity code does not count toward Shift Equity totals. |
Note
This indicator can be found in
.Activity Code Indicator Schedule Standard 3
Activity Code Indicator Schedule Standard 3 determines whether a specific activity code can be used by the system when populating need-based schedules.
This streamlines the schedule population process, since the system does not need to consider each and every activity code when building the schedule. Other activity codes that should not be included are codes that are always manually assigned, such as meetings, codes that are only used for core schedules, non-productive activities, such as OFF or PTO, or codes for seldom-used activities, such as a 4-hour shift.
Note
If activity codes are set up under a Profile record, those are the only activities that can be scheduled for that profile. Be sure some of these activity codes are set to Y to allow automatic population.
The default for this indicator is set to N, so only those indicators that should be used for automatic scheduling need to be updated. Multiple activity codes can be updated at the same time by using the Replace feature.
Valid Indicator Options:
N |
This activity code can not be used when automatically populating a schedule. |
Y |
This activity code can be used when automatically populating a schedule. |
Note
This indicator can be found in
.Activity Code Indicator Schedule Standard 4
Activity Code Indicator Schedule Standard 4 is used to determine whether hours assigned to employees through this activity code should accumulate toward their Weekly Overtime Hours totals. Overtime hours totals can be validated during the scheduling process, using the SchedHours rule.
Valid Indicator Options:
Y |
Yes, hours assigned with this activity code should accumulate towards Weekly Overtime Hours totals. |
N |
No, hours assigned with this activity code should not accumulate toward Weekly Overtime Hours totals. |
This indicator is found on
.Note
The default for this indicator is set to N, unless it is updated via Value button in the left pane. Click the card arrow to open the record. Set the Default field to Yes to set the default value. This will override the current default value.
. Open the record and then click on theActivity Code Indicator Schedule Standard 5
Activity Code Indicator Schedule Standard 5 is used to determine whether hours assigned to employees through this activity code should accumulate toward their Approved Hours totals. Approved hours totals can be validated during the scheduling process, using the SchedHours rule.
Valid Indicator Options:
Y |
Yes, hours assigned with this activity code should accumulate towards Approved Hours totals. |
N |
No, hours assigned with this activity code should not accumulate toward Approved Hours totals. |
This indicator is found on
.Note
The default for this indicator is set to Y, unless it is updated via Values button in the left pane. Click the card arrow to open the record. Set the Default field to No; this will override the current default value.
. To change the indicator, open the record (see screen print below for search criteria) and then click on theActivity Code Indicator Schedule Standard 7
Activity Code Indicator Schedule Standard 7 is used to determine which activity codes can be used for schedule options for the Request to Work feature. This indicator is found in
.Valid Indicator Options:
N |
This activity code cannot be submitted for Request to Work. |
Schedules including this activity code are not included in the results list. |
Y |
This activity code can be submitted for Request to Work. |
Schedules including this activity code are included in the results list.
|
Note
Activity Codes can also be activated for requests to work in Request to Work field to Yes.
by setting theActivity Code Indicator Self Scheduling Standard 1
Activity Code Indicator Self Scheduling Standard 1 determines if activity codes are available to employees when using the self scheduling feature. Only those activity codes with the setting of Y are included in the drop down menu of available activity codes. This indicator is found in
.Valid Indicator Options:
N |
Activity is not available to employees for self scheduling. |
The activity code is not included as an option in the drop-down menu. |
Y |
Activity is available to employees for self scheduling. |
The activity code is included in the drop-down menu when self scheduling, but only when there are needs for the activity code. Note When activity codes are specified for a Profile, only those activity codes also included in the list of activity codes are displayed. |
A |
Activity is available to employees for self scheduling. |
The activity code is included in the drop-down menu when self scheduling, even if there are no needs for the activity code. This can be used when employees want to show that they are available to work an extra shift or for on call. |